What is the heating of the well? What are the requirements for use?


Release Time:

2022-09-02

What is the heating of the well? What are the requirements for use? The well estuary heating device is an advanced light prefabricated structure, which does not have high requirements for the foundation and basic. The total weight of the entire well estuary is about 5 tons, and the average stress on the entire well heating is 0.4 tons/m2. Only slight vibration.

What is the heating of the well? What are the requirements for use?

What is the heating of the well? What are the requirements for use? The well estuary heating device is an advanced light prefabricated structure, which does not have high requirements for the foundation and basic. The total weight of the entire well estuary is about 5 tons, and the average stress on the entire well heating is 0.4 tons/m2. Only slight vibration.

Q_WUR4dBTzeSaLPB_HlPcQ.jpg

When building a wall, the air inlet of 10004002 should be reserved. Dust, anti -mesh, diameter 1000mm2 in diameter at the wind mouth. 500500 power cable entrance.

Except for the heating body of the well, the foundation of electrical cabinets, lighting, monitoring and other equipment will be constructed according to the process layout and single equipment description, which will not be repeated here. The well entrance heating thermal wind pipeline mainly plays the role of transporting hot air. All pipelines are welded with A3 steel plate rolling. The outside of the pipeline is used to keep 80mm silicate silicate insulation cotton insulation, and thermal insulation cotton is covered with aluminum plate.

The precautions in the process of heating in the well have the following aspects.

1. Mine enters the autumn and winter seasons. Due to the cold weather in the north, most of the mine production will be affected. The normal operation of its well heating equipment and machinery will be affected by low temperature weather. While the air input well, we need to make low -temperature requirements for fresh air entering the mine. Only when the temperature reaches the low -temperature standard of the equipment can the safety operation of the equipment and the safety of the miners' life.

2. The time required for heating protection and maintenance of wells in the well is also a problem factor that we need to test and screen, because this will affect the production efficiency in the actual industrial and mining transportation process in the later period.

3. The higher the efficiency of the well heating, the higher the cost performance. At present, a large amount of electrical equipment has been added to the well entrance heating equipment, which can basically meet the operation requirements of the crew and the internal temperature requirements. Therefore, when the temperature of the mine is reached, the energy saving of equipment is more effective. This is a problem that we need to test and screen, because this is a long -term production cost, and the production efficiency of mines is also related to the economic benefits of a mine.

4. Whether the well heating is easy to maintain, which is one of the main issues of testing and screening. Due to the large investment in the well entrance and whether the equipment is easy to operate and maintain, we have put forward requirements for our future production and maintenance. If the equipment is complicated and difficulty in maintaining, whether the technical requirements for the deployment of the later mine heating personnel will also increase the cost of the mine.

Therefore, the above points are related issues that we should pay attention to when using the well. We are the manufacturers heated in Jingkou. If you want to know more about this, you can contact us. We can introduce you from different aspects so that everyone can have a more detailed understanding. The well entrance heating equipment provides us with a lot of convenience and a very good product.

 

Transen

We specialize in the research and development and production of clean heating products such as solid electric energy storage heating devices, high-voltage electrode boilers, air waste heat recovery machines, electric coal substitutes, wind power heating, and peak shaving.

Contact

Add: No. 2-2 Songlan Street, Jinzhou District, Dalian City, Liaoning Province, China

Tel: +86-411-39241918

Email: master@dltransen.cn


Copyright © 2022 Dalian Transen Technology Co.,Ltd. | SEO | Business License | Powered by 300.cn